architectural design technician
Title posted on Monster -
Architectural Design Coordinator Co-op
Posted on
June 30, 2024
by
Employer details
Ontario Transit Group
Job details
Company Description
Ferrovial Construction Canada Inc. and VINCI Construction Grands Projects are undertaking the design, build, and finance the Ontario Line Southern Civil, Stations, and Tunnel (South Civil) package.
As Ontario Transit Group, we are now mobilizing our design and construction crews, with major works. The South Civil contract is anticipated to be completed in 2030.
The project will strengthen Ontario's economy by supporting an estimated 1,500 jobs at the peak of construction.
What is the project?
A six-kilometer tunnel and associated tunnelling works from Exhibition to Don Yard portal (west of the Don River).
Stations:One above-ground station to be integrated with the existing GO Transit Exhibition Station.
Two underground stations to be integrated with the existing TTC Osgoode and Queen
-
LocationToronto, ON
-
SalaryNot available
- Start date
Starts as soon as possible
- vacancies
1 vacancy
- Source
Monster
#fb150a2b-a50c-4314-b84e-6f55978be7dd
Advertised until
2024-07-31
Important notice: This job posting has been provided by a partner site. Job Bank is not responsible for this content.
Report a problem with this job posting
Thank you for your help!
You will not receive a reply. For enquiries, please contact us.